01 / HOW WE WORK
Quality control applies to the machinery Tianxianghao builds—not to a customer's finished steel pipe unless separate pipe inspection equipment and requirements are specified. The scope of equipment checks and trial operation follows the agreed project configuration.
Component selection and machine configuration are reviewed against the technical agreement and operating conditions.
Production teams carry out checks during equipment manufacture and assembly, with process guidance from experienced engineers.
Before shipment, equipment is adjusted and trial-operated where applicable to check its operation and address identified issues.
Transport protection, installation guidance, commissioning and operator training support the transition to customer operation.
02 / COMPONENT SELECTION
Tianxianghao selects mechanical, hydraulic and electrical components based on machine duties and customer requirements. The current project agreement determines the final supplier, component model and scope.
03 / MANUFACTURING FACILITIES
Real manufacturing photographs help customers understand the workshop environment and equipment processing capability behind Tianxianghao machinery. These images show workshop operations, not individual documented inspection results.
04 / FACTORY CONTROL POINTS
Tianxianghao has published a product inspection workflow that identifies final quality checks (FQC), handling of nonconforming results, reinspection and outgoing quality checks (OQC) before delivery.
A documented decision point before equipment moves to the next stage.
If an issue is identified, the flow chart provides a route for corrective work and another inspection.
The published workflow includes a final checkpoint before load and delivery.
The specific inspection documents and acceptance criteria are determined by the project agreement.
Published Product Inspection Workflow
05 / BEFORE & AFTER DELIVERY
Pre-shipment adjustments and trial operation allow engineers to review the configured machine's operation and address issues identified during testing.
Shipment planning takes account of machine size and handling needs to help reduce damage risk during loading, transport and unloading.
Engineering support can include site installation, commissioning, operator safety, operation and routine maintenance training.
Explore After-Sales Services →Tianxianghao's published warranty covers eligible issues under the contract terms. Warranty start date, scope, charges and service arrangements are defined in the agreed contract.
06 / DOCUMENTED CREDENTIALS
Tianxianghao publishes ISO 9001 quality management certification and additional machinery-related certificates and patents. The applicable documentation depends on the equipment supplied and the scope stated in each document.
The published certificate identifies Tianxianghao and a defined scope covering sales of listed pipe production and supporting equipment. It is evidence of a certified quality management system within that scope, not certification of every individual machine or the finished pipes produced by customers.
Machine conformity documents, patents and other certificates should be checked against the exact equipment model and destination-market requirements.
Review Certificates & Patents →QUALITY REQUIREMENTS FOR YOUR PROJECT
Share your machinery requirements and any agreed component brands, factory trial-run scope, acceptance documents, shipment arrangements or commissioning needs. Our team can discuss them in the context of your project.